Hexaware Recognized in Gartner Magic Quadrant
Hexaware Recognized in Gartner Magic Quadrant
Reduce unnecessary CSS and improve initial render. functions.php: only enqueue form-v5.css when the page actually renders a form (checks ACF layouts, certain post types, and specific page templates) to avoid loading form styles site-wide. header.php: add preload hints for core stylesheets (main, typography, custom, responsive, theme stylesheet) with sensible versioning (filemtime and WP_DEBUG), and add preconnect hints for cdn.hexaware.com and app.factors.ai. Keeps existing OneTrust/Cookie and GTM script behavior.
Case Study
Hexaware’s solution helped a health leader cut TCO by 64% and boost speed to market by 70% by migrating over 15,000 servers.
Our client is a global leader in health information technology and clinical research with a revenue exceeding $13.8 billion, offering advanced analytics, technology solutions, and clinical research services to the life sciences sector. They wanted to embrace Azure cloud adoption to deliver greater value to their customers, enable faster time to market, and innovate with more flexibility as they scaled.
The client’s infrastructure is extensive, spanning 20 data centers with over 15,000 servers and more than 800 applications. The on-premises IT systems and operations costs were steadily increasing, and with an impending data center lease expiration, the client urgently needed to modernize their IT environment. They decided to transition from a CapEx to an OpEx model.
The CTO aimed to adopt Azure to deliver greater value to their customers, enable faster time to market, and innovate with more flexibility as they scaled. The large and complex on-premises ecosystem made operations highly inflexible. Workloads running on physical servers made it challenging to provision new servers or decommission unnecessary ones based on fluctuating demands. This rigidity resulted in significant time and effort spent on these tasks, leaving the IT team with little capacity for innovation. Additionally, the high TCO was driven by overprovisioning for most workloads and low utilization rates.
These challenges highlight the need for a strategic transformation of the client’s IT infrastructure to adopt a more flexible, scalable, and cost-effective model using Azure cloud services. The client’s decision to adopt Azure aims to address these challenges by moving away from a CAPEX model to a more flexible and cost-effective cloud solution, enabling them to innovate and scale more effectively.
Cloud migration of workloads from complex IT environments, consisting of multiple legacy systems and applications, posed significant challenges. The process demanded considerable changes to existing processes, infrastructure, and applications. Seamless integration with the existing systems was critical, requiring the cloud platform to be highly compatible. Moreover, the migration of large-scale workloads necessitated a cloud platform capable of handling high-speed and high-efficiency migration while being adequately prepared and sized for the task.
Hexaware addressed these challenges by implementing a cloud migration program that included the following strategies:
Through these measures, Hexaware ensured a seamless, efficient, and high-speed cloud migration, transforming the client’s IT environment into a modern, flexible, and reliable system.
Hexaware’s solution delivered transformative results across multiple dimensions, enhancing operational efficiency and competitive advantage.
Hexaware empowered the client to establish a robust foundation for growth, enabling them to swiftly generate value and make bold, decisive choices in a rapidly evolving industry. The success of the migration hinged on a thorough IT infrastructure discovery, which provided the migration team with clean data and a comprehensive 360-degree view of the client’s large and complex operating environment. By forming an integrated client/partner team, Hexaware facilitated faster and more frequent migrations. Additionally, the convergence of operations and engineering teams streamlined the migration process and ensured a seamless handoff to operations upon project completion.